InglewoodDesign & Strategy

TWO-STORY ADU IN INGLEWOOD:
COSTS, PERMITS & ROI IN 2026

Inglewood is one of the most compelling ADU markets in Southern California — driven by SoFi Stadium, LAX, and a rental market that rewards larger units. Here is everything you need to know about building a two-story ADU in the city, from the unique permit rules to a full 10-year income projection.

February 202613 min readInglewood, CA

$2,522/mo

Avg 2BR rent

Inglewood, CA — February 2026 (Rent.com)

$350K–$430K

Two-story build cost

Attached two-story ADU, Inglewood (2026)

3–5 months

Permit timeline

City of Inglewood Building Safety Division

8.5 years

Break-even

Typical payback period at $2,500/mo rental income

1. Why Inglewood Is One of LA's Best ADU Markets

Inglewood has undergone a remarkable transformation over the past decade. The opening of SoFi Stadium in 2020, the adjacent Hollywood Park development, and the city's proximity to Los Angeles International Airport (LAX) have combined to create one of the strongest rental demand environments in Southern California. For homeowners considering an ADU, this context matters enormously: a well-built unit in Inglewood commands rents that rival far more expensive neighborhoods in LA City.

The city's median home value sits in the $700,000–$800,000 range, meaning most long-term homeowners have substantial equity to tap for construction financing. At the same time, Inglewood's lot sizes — typically 5,000 to 7,500 square feet in residential zones — are large enough to accommodate a meaningful attached addition without eliminating usable outdoor space. The combination of strong rental demand, available equity, and adequate lot sizes makes Inglewood a textbook case for ADU investment.

Super Bowl LXI (2027) at SoFi Stadium — Inglewood is already seeing elevated short-term rental demand in anticipation of the 2027 Super Bowl. New ADUs permitted and built in 2026 will be positioned to capture both the event surge and the long-term rental market that follows major venue development.

Inglewood's rental market data as of early 2026 tells a compelling story. The average two-bedroom apartment rents for $2,522 per month — a 10% year-over-year increase — while one-bedroom units average $1,975 per month. These figures are not outliers; they reflect a sustained structural shift in demand driven by employment growth at the airport, entertainment venues, and the broader Hollywood Park mixed-use development that will eventually add 2,500 residential units, 300,000 square feet of retail, and a 6,000-seat performance venue to the immediate area.

2. The Two-Story Rule: What Inglewood Actually Allows

This is the most important thing to understand before planning a two-story ADU in Inglewood: the city's 2024 ADU Development Standards limit new detached ADUs to one story or 16 feet. This is more restrictive than LA City, which allows detached ADUs up to 25 feet in some zones. If you want a two-story ADU in Inglewood, it must be attached to the primary residence.

Detached vs. Attached: Inglewood's 2024 standards cap standalone backyard structures at one story (16 ft). A two-story ADU in Inglewood must be physically connected to the main house — either as a side addition, a rear addition, or a second-story addition above the garage or an existing single-story wing. This distinction affects your site plan, structural engineering scope, and total cost.

The good news is that an attached two-story ADU can match the height of the primary dwelling — which in most Inglewood residential zones means up to two full stories. This opens the door to configurations that a detached structure cannot achieve: a 1,200 square foot two-bedroom, two-bathroom unit spread across two floors, with a private entrance, separate utilities, and full kitchen. For homeowners with a single-story primary residence and a side yard or rear yard with adequate setbacks, this is a highly viable path to maximizing rental income.

It is also worth noting that the California Department of Housing and Community Development (HCD) reviewed Inglewood's ADU ordinance in May 2025 and issued a compliance letter. The city has since updated its standards to align with state law, including provisions for previously unpermitted ADUs and expanded protections for Junior ADUs (JADUs). If you have an existing unpermitted structure on your property, the current regulatory environment is unusually favorable for legalization.

3. Inglewood ADU Regulations at a Glance

Inglewood is an incorporated city with its own municipal code — it is not governed by LA City or LA County planning rules. The following standards are drawn from the Inglewood Municipal Code (IMC) Article 35 and the 2024 ADU Development Standards published by the Economic and Community Development Department.

StandardDetached ADUAttached ADUGarage Conversion
Max Height1 story / 16 ftMatch primary dwelling heightMatch existing structure
Max Size1,200 sq ft850 sq ft or 50% of primary (whichever is greater)Up to 850 sq ft
Side Setback4 ft minimum4 ft minimum (new footprint)0 ft (existing footprint)
Rear Setback4 ft minimum4 ft minimum (new footprint)0 ft (existing footprint)
Parking RequiredNo (within ½ mi of transit)No (within ½ mi of transit)No
Owner OccupancyNot required (post-2020)Not required (post-2020)Not required (post-2020)
Rent ControlExempt (AB 1482)Exempt (AB 1482)Exempt (AB 1482)
Key distinction: The 850 sq ft cap on attached ADUs applies only when the primary dwelling is 850 sq ft or larger. If the primary dwelling is smaller, the maximum ADU size is 850 sq ft regardless. For most Inglewood single-family homes (typically 1,000–1,800 sq ft), the effective maximum for an attached ADU is 850 sq ft per floor — meaning a two-story attached ADU could reach up to 1,200 sq ft total (subject to site-specific review).

One of the most significant regulatory advantages in Inglewood — and across California — is the rent control exemption. New ADUs built after January 1, 2020 are exempt from local rent stabilization ordinances under AB 1482. Inglewood has its own RSO with an allowable annual increase of 3.0% for FY 2025–2026, but your new ADU is not subject to it. You can set market rents and adjust them freely, which significantly improves the long-term ROI calculation.

4. The Permit Process: Inglewood vs. LA City

Many homeowners are surprised to learn that Inglewood has its own Building Safety Division — it does not use the Los Angeles Department of Building and Safety (LADBS) or the LA County Department of Regional Planning. This matters because the permit process, fee schedule, and plan check timeline are entirely separate from what you may have read about LA City ADU projects.

The Inglewood Building Safety Division is located at City Hall and handles all residential building permits. For an ADU project, the typical submission package includes five sets of architectural plans on 24" × 36" sheets, two sets of structural calculations stamped by a licensed engineer, energy compliance documentation (Title 24), and a recorded covenant with the LA County Recorder confirming the ADU's status. LA County Fire Department also reviews plans separately and issues its own plan check invoice.

StepActionTypical TimelineWho Handles It
1Feasibility review & site assessment1–2 weeksContractor / architect
2Architectural drawings & structural calcs3–6 weeksLicensed architect + engineer
3Submit permit application to Inglewood Building Safety1 weekContractor
4Plan check (first review)4–8 weeksCity of Inglewood
5Corrections & resubmittal (if required)2–4 weeksArchitect + contractor
6Permit issuance1–2 weeksCity of Inglewood
7Construction4–6 monthsGeneral contractor
8Final inspections & certificate of occupancy2–4 weeksCity of Inglewood
Plan check timeline: Inglewood's first plan check review typically takes 4–8 weeks for residential ADU projects. Projects that require corrections (most do) add another 2–4 weeks for resubmittal. Total permit timeline from application to issuance: 3–5 months. This is comparable to LA City but uses a different office and fee schedule.

Inglewood's building permit fees are calculated as a percentage of construction valuation. For a two-story attached ADU valued at $350,000–$430,000, expect total city permit fees of $8,000–$14,000, plus a separate LA County Fire Department plan check fee. Energy plan check fees are capped at $2,000. School fees (LAUSD or Inglewood Unified) apply to new construction and are calculated per square foot.

5. Real Costs for a Two-Story ADU in Inglewood (2026)

Construction costs in Inglewood track closely with the broader LA County market. For a two-story attached ADU — which requires more structural engineering than a single-story detached unit — the all-in project cost typically ranges from $350,000 to $430,000 for a 900–1,200 square foot unit with mid-range finishes. This translates to approximately $300–$380 per square foot, consistent with the GreatBuildz 2026 benchmark of $300–$400 per square foot for new construction ADUs in LA County.

Cost CategoryLow EstimateHigh EstimateNotes
Architecture & engineering$12,000$22,000Two-story requires licensed structural engineer
City permits & fees$8,000$14,000Inglewood Building Safety + LA County Fire
School fees$3,500$6,000Per sq ft, new construction only
Site preparation & foundation$22,000$40,000Attached addition — shared foundation possible
Framing & structural$55,000$85,000Two-story adds ~20% vs. single-story
Roofing$8,000$15,000Must match or complement primary residence
Exterior (stucco, windows, doors)$18,000$30,000
Plumbing (rough & finish)$18,000$28,000New meter or sub-panel required
Electrical (rough & finish)$14,000$22,000200A panel upgrade often required
HVAC (mini-split system)$8,000$14,000Per-zone mini-split recommended
Insulation & drywall$12,000$18,000
Interior finishes (cabinets, tile, flooring)$28,000$45,000Mid-range finishes
Appliances & fixtures$8,000$14,000
Landscaping & site restoration$5,000$10,000
Contingency (10%)$22,000$36,000Always budget a contingency
Total$241,500$399,000Typical range: $350K–$430K all-in
The two-story premium: Compared to a single-story 600–800 sq ft detached ADU (typically $200,000–$260,000 in Inglewood), a two-story attached ADU costs roughly $90,000–$170,000 more. However, the additional square footage — often 400–600 sq ft — commands proportionally higher rent, making the premium worthwhile in Inglewood's current market.

6. Inglewood Rental Market: The Numbers

Inglewood's rental market in early 2026 is defined by strong demand for larger units. Two-bedroom apartments average $2,522 per month — a 10% year-over-year increase — while the studio market has softened (-20% YoY), reflecting a tenant preference shift toward more space. This trend directly benefits two-story ADU owners, who can offer the two-bedroom, two-bathroom configurations that command the highest rents.

Unit TypeAvg Monthly Rent (2026)YoY ChangeBest Inglewood Neighborhoods
Studio$2,441-20%Downtown Inglewood, Morningside Park
1 Bedroom$1,975-1%All neighborhoods
2 Bedrooms$2,522+10%Morningside Park, Downtown, Fairview Heights
3 Bedrooms (est.)$3,100–$3,500N/AMorningside Park, Centinela Heights

The neighborhood breakdown matters for ADU planning. Morningside Park — the neighborhood closest to SoFi Stadium and Hollywood Park — commands the highest rents in the city, with studios averaging $2,960 per month. Downtown Inglewood follows at $2,460 for studios. For a two-bedroom ADU in Morningside Park, market rents of $2,800–$3,200 per month are achievable for a well-finished unit with private entrance and in-unit laundry.

Rent control exemption advantage: Inglewood's RSO caps annual increases at 3.0% for covered units. Because your new ADU is exempt from the RSO under AB 1482, you can adjust rents to market rate at each lease renewal — a significant long-term income advantage over older rental stock in the city.

Vacancy rates in Inglewood remain low, driven by the city's employment base. LAX employs approximately 50,000 people directly and supports another 500,000 jobs regionally. SoFi Stadium and the Hollywood Park entertainment district add hospitality and event-industry workers who prefer proximity to their workplace. The result is a tenant pool that is broad, stable, and growing — an ideal backdrop for a new ADU investment.

7. ROI & Break-Even Projections

The ROI calculation for a two-story attached ADU in Inglewood depends on three variables: total project cost, monthly rental income, and vacancy rate. Using conservative assumptions — a $390,000 all-in cost, $2,500 per month rent, and a 5% vacancy rate — the break-even period is approximately 8.5 years. Under more optimistic assumptions (Morningside Park location, $2,900/month rent, 3% vacancy), break-even falls to 7.2 years.

ScenarioBuild CostMonthly RentAnnual Net IncomeBreak-Even10-Year Gain
Conservative$390,000$2,500$28,50013.7 yrs$285,000
Base Case$390,000$2,500$28,5008.5 yrs*$285,000
Optimistic (Morningside Park)$390,000$2,900$33,0607.2 yrs*$330,600
Premium (3BR, 1,200 sq ft)$430,000$3,300$37,6207.0 yrs*$376,200

* Break-even calculations include a 3% annual rent increase and 5% vacancy rate. The "Base Case" and above scenarios account for a $100,000 property value increase from the ADU addition, reducing the effective payback period. Net income figures deduct estimated annual maintenance ($2,400), insurance ($1,200), and property management (0% — owner-managed).

Property value uplift: Adding a well-finished ADU to an Inglewood home typically increases the property's appraised value by $80,000–$130,000, according to LA County appraisers. This equity gain is realized immediately upon completion and reduces the effective net cost of the project by 20–33%.

8. Best Floor Plan Configurations

Because Inglewood requires two-story ADUs to be attached, the floor plan is constrained by the primary residence's footprint and the available side or rear yard. The most common configurations for Inglewood lots are:

ConfigurationTotal Sq FtLayoutBest ForEst. Rent
Side addition, 2 stories800–1,000 sq ft1BR/1BA down, 1BR/1BA upCouples, young professionals$2,200–$2,600/mo
Rear addition, 2 stories900–1,200 sq ftLiving/kitchen/bath down, 2BR upSmall families, roommates$2,500–$3,000/mo
Above garage, 2 stories600–850 sq ftStudio or 1BR per floorSingles, airport workers$1,900–$2,400/mo
Full rear wing, 2 stories1,000–1,200 sq ft2BR/2BA — full apartment layoutFamilies, long-term tenants$2,800–$3,400/mo

The full rear wing configuration — a two-story addition spanning the rear of the primary residence — consistently delivers the highest rental income in Inglewood. The key design considerations are: a private entrance that does not require passing through the main house, a separate utility meter, sound attenuation between the shared wall, and adequate natural light on both floors. A skilled architect can typically achieve all four on a standard 50' × 130' Inglewood lot.

In-unit laundry is a strong differentiator in Inglewood's rental market. Adding a stacked washer/dryer in a closet on the lower floor adds approximately $3,000–$5,000 to construction cost but can justify $100–$200 per month in additional rent and significantly reduces vacancy time. It is one of the highest-ROI finish decisions available to ADU owners.

9. Financing Your Inglewood Two-Story ADU

With project costs in the $350,000–$430,000 range, most Inglewood homeowners finance their two-story ADU through a combination of home equity and construction lending. The city's median home value of $700,000–$800,000 means that homeowners who purchased before 2020 typically have $300,000–$500,000 in equity — more than enough to support a HELOC or cash-out refinance.

Financing OptionBest ForTypical Rate (2026)Key Advantage
HELOCHomeowners with 40%+ equityPrime + 0.5–1.5% (~8–9%)Draw as needed, interest-only during construction
Cash-out refinanceLow existing mortgage rate holders6.5–7.5% (30-yr fixed)Single payment, lower rate than HELOC
Construction loan → permanentNew purchases or major renovations7–8.5%Covers land + build in one product
CalHFA ADU GrantOwner-occupants, income-qualifiedFree ($40,000 grant)No repayment required — apply first
ADU-specific lender (RenoFi, etc.)Limited equity situations7–9%Lends against post-renovation value
CalHFA $40,000 ADU Grant: Inglewood homeowners who are owner-occupants and meet LA County income limits may qualify for California's ADU Grant Program, which provides up to $40,000 in pre-development cost assistance — no repayment required. This grant covers architecture, engineering, permit fees, and soil reports. Apply before breaking ground; funds are allocated on a first-come, first-served basis. Read the full CalHFA grant guide →

10. Common Mistakes Inglewood Homeowners Make

After working on ADU projects across Inglewood and the South Bay, the Skyline Builders team has seen the same avoidable errors appear repeatedly. Understanding them before you start can save months of delay and tens of thousands of dollars.

1

Assuming Inglewood uses LA City or LA County rules

Inglewood is its own incorporated city. Its permit office, fee schedule, plan check process, and zoning code are entirely separate from LADBS and the LA County DRP. Contractors who primarily work in LA City often make costly assumptions when they take on an Inglewood project for the first time.

2

Planning a detached two-story ADU

Inglewood's 2024 standards limit new detached ADUs to one story or 16 feet. A two-story detached ADU will not be approved. If your site plan calls for a standalone backyard structure, it must be single-story. For two stories, the ADU must be attached to the primary residence.

3

Underestimating structural engineering costs

An attached two-story addition requires a licensed structural engineer to design the connection to the existing foundation and the second-floor framing system. This is not optional and is more complex than a detached single-story slab. Budget $5,000–$10,000 for structural engineering alone.

4

Skipping the utility upgrade assessment

Inglewood requires a separate utility meter for new ADUs. If the primary residence is on a 100A panel, a 200A upgrade is typically required before the ADU can be connected. Southern California Edison's interconnection process adds 4–8 weeks to the timeline and $8,000–$15,000 to the budget.

5

Not applying for the CalHFA grant before starting

The CalHFA ADU Grant covers pre-development costs up to $40,000. It must be applied for before you break ground. Many Inglewood homeowners who qualify miss this benefit because they start construction before checking eligibility.

6

Designing without a private entrance

A two-story ADU that requires tenants to pass through the main house is nearly unrentable and may not pass final inspection. Every ADU must have its own independent entrance. On tight lots, this sometimes requires a side-yard access path — plan for it in the site design from day one.

11. Frequently Asked Questions

Can I build a two-story detached ADU in Inglewood?
No. Inglewood's 2024 ADU Development Standards limit new detached ADUs to one story or 16 feet. For a two-story ADU, it must be attached to the primary residence.
How long does the permit process take in Inglewood?
Typically 3–5 months from application to permit issuance. The first plan check review takes 4–8 weeks. Most projects require at least one round of corrections, adding another 2–4 weeks. Total construction time after permit issuance is 4–6 months for a two-story attached ADU.
Is my new ADU subject to Inglewood's rent control ordinance?
No. New ADUs permitted after January 1, 2020 are exempt from local rent stabilization ordinances under California AB 1482. You can set market rents and adjust them freely at each lease renewal.
What is the maximum size for an attached ADU in Inglewood?
850 square feet, or 50% of the primary dwelling's square footage, whichever is greater. For a 1,400 sq ft primary home, the maximum attached ADU is 850 sq ft (50% = 700 sq ft, so the 850 sq ft cap applies). A two-story attached ADU can distribute this across two floors.
Do I need to live on the property to build an ADU in Inglewood?
No. California state law removed the owner-occupancy requirement for ADUs built between 2020 and 2025. As of 2026, check with the City of Inglewood for the current status, as the state law provision was time-limited. However, owner-occupancy is required to qualify for the CalHFA $40,000 ADU Grant.
What permits does Inglewood require for an ADU?
A building permit from the City of Inglewood Building Safety Division, a separate LA County Fire Department plan check, and a recorded covenant with the LA County Recorder. You will also need electrical, plumbing, and mechanical permits, which are typically pulled by the general contractor as sub-permits under the main building permit.
How much does a two-story ADU increase my property value in Inglewood?
Based on LA County appraisals, a well-finished two-story ADU in Inglewood typically increases property value by $80,000–$130,000. The exact figure depends on the unit's size, finish level, and the current comparable sales in the neighborhood.
Can Skyline Builders handle the entire project in Inglewood?
Yes. Skyline Builders CA Inc. is a licensed general contractor (CSLB #1122298) with direct experience in Inglewood's permit process. We handle design coordination, permit submission, construction, and final inspection — from site assessment to certificate of occupancy.

Ready to Build Your Two-Story ADU in Inglewood?

Skyline Builders CA Inc. has completed ADU projects across Inglewood, Morningside Park, and the South Bay. We handle design, permits, and construction — and we know Inglewood's Building Safety Division personally.